usr/sap/FDB/SYS/exe/uc/hpia64/R3load: job finished with 1 error(s) M圜luster (127.24.Imp): 325: affected physical table is DOKCLU. M圜luster (127.24.Imp): 324: error during conversion of cluster item. M圜luster (127.24.Imp): 2944: failed to unpack cluster item. M圜luster (127.24.Imp): 3879: received return code 2 from decompression routine. M圜luster (127.24.Imp): 5908: received return code 2 from G_deca. M圜luster (127.24.Imp): 5898: decompression of cluster item failed. YCluster (127.24.Imp): 8218: deviation detected in key field 2 of 5. But we are facing following error in database import in import ABAP step: Moreover database export have been completed successfully. SPUMG and other pre-requsite reports have successfully completed. We have successfully upgrade our production system form 4.6C to ECC 6.0 EHP 6.